[1]马文娟,何案华,曹 开,等.“九五”前兆仪器与“十五”前兆管理系统的整合*[J].地震研究,2010,33(04):360-364.
MA Wen-juan,HE An-hua,CAO Kai,et al.“The ninth Five-Year Plan”omen instrument and“The tenth Five-Year Plan”omen manage systematic integrating[J].Journal of Seismological Research,2010,33(04):360-364.
点击复制
《地震研究》[ISSN:1000-0666/CN:53-1062/P]
- 卷:
-
33
- 期数:
-
2010年04期
- 页码:
-
360-364
- 栏目:
-
- 出版日期:
-
2010-04-23
文章信息/Info
- Title:
-
“The ninth Five-Year Plan”omen instrument and“The tenth Five-Year Plan”omen manage systematic integrating
- 作者:
-
马文娟1; 2; 何案华3; 曹 开4; 赵 刚3; 李芳芳1; 常 明1; 吴晓燕1; 延海军1
-
(1.宁夏回族自治区地震局,银川 750001; 2.同济大学 软件学院,上海 200092;
3.中国地震局地壳应力研究所,北京 100085; 4.北京市地震局,北京 100045)
- Author(s):
-
MA Wen-juan1; 2; HE An-hua3; CAO Kai4; ZHAO Gang3; LI Fang-fang1
-
(1.Earthquake Administration of Ningxia Hui Autonomous Region,Yinchuan 750001,Ningxia,China)(2.School of Software Engineering,Tongji University,Shanghai 200092,China)(3.The Institute of Crustal Dynamics,CEA,Beijing 100085,China)(4.Earthquake Administratio
-
- 关键词:
-
“九五”前兆仪器; 协议转换; “十五”前兆系统
- Keywords:
-
“The ninth Five-Year Plan”instrument; protocol conversion; “The tenth Five-Year Plan”instruments
- 分类号:
-
TP392
- DOI:
-
-
- 摘要:
-
2009年5月开始以北京市地震局板桥台、东三旗台、赵各庄台等7个台站为试点,逐步完成“九五”前兆仪器网络化改造,在保留原“九五”通信模式的前提下,完成其“九五”前兆仪器无缝接入到“十五”前兆数据管理系统。从各台为期半年多的运行结果可以看出,其运行稳定、产出资料可靠且改造方案成本低,为“九五”前兆仪器整体接入“十五”管理系统提供了高效可靠的技术参考。
- Abstract:
-
Take the station about Banqiao Dong San and Zhao Ge zhuang etc of Beijing as experimental unit,after the network-rization make over beginning to accomplish“The ninth Five-Year Plan”omen instrument step by step on May 15,2009,accomplish whose seamless“The ninth Five-Year Plan”omen instrument cut-over under the premise reserving plain“The ninth Five-Year Plan”communication pattern,arriving at“The tenth Five-Year Plan”omen data management system.From operation result,It can be seen every station lasting for the half a year,whose runs the data stabilizing,outputing reliably and reforms scheme cost low,“The tenth Five-Year Plan ”management system has provided the reliable high-effect technology reference to“The ninth Five-Year Plan”omen station overall cut-over.
备注/Memo
- 备注/Memo:
-
收稿日期:2009-11-03
基金项目:2007年公益性行业专项(H200708045)资助.
更新日期/Last Update:
2010-04-23