|本期目录/Table of Contents|

[1]胡利鸿,王东伟,郭涛.某核级后备盘台设备地震响应分析与振动台试验研究[J].地震研究,2024,47(04):635-646.[doi:10.20015/j.cnki.ISSN1000-0666.2024.0055]
 HU Lihong,WANG Dongwei,Guo Tao.Seismic Response Analysis and Qualification Test of a Nuclear-grade Back-up Panel[J].Journal of Seismological Research,2024,47(04):635-646.[doi:10.20015/j.cnki.ISSN1000-0666.2024.0055]
点击复制

某核级后备盘台设备地震响应分析与振动台试验研究(PDF/HTML)

《地震研究》[ISSN:1000-0666/CN:53-1062/P]

卷:
47
期数:
2024年04期
页码:
635-646
栏目:
出版日期:
2024-12-01

文章信息/Info

Title:
Seismic Response Analysis and Qualification Test of a Nuclear-grade Back-up Panel
作者:
胡利鸿1王东伟2郭涛1
(1.四川省星时代智能卫星科技有限公司制造业创新中心,四川 成都 610041; 2.中国核动力研究设计院核反应堆系统设计技术重点试验室,四川 成都 610041)
Author(s):
HU Lihong1WANG Dongwei2Guo Tao1
(1.Sichuan Xingshidai Intelligent Satellite Technology Co.,Ltd. Manufacturing Innovation Center,Chengdu 610041,Sichuan,China)(2.Science and Technology on Reactor System Design Technology Laboratory,Nuclear Power Institute of China,Chengdu 610213,Sichuan,China)
关键词:
核电 后备盘台 抗震 鉴定试验
Keywords:
nuclear power back-up panel aseismic qualification test
分类号:
TU973
DOI:
10.20015/j.cnki.ISSN1000-0666.2024.0055
摘要:
对核电站主控制室内的后备盘台在地震作用下的地震响应特性进行仿真分析和试验研究。反应谱分析结果表明,后备盘台的最大Mises应力为91.89 MPa,小于结构材料的最大屈服极限,即后备盘台具有良好的抗震性能。时程分析结果表明,随着高度的增加,结构的最大响应加速度幅值逐渐增加,且横向振动幅值增益最为明显。对后备盘台显示屏安装区域的振动信号进行时频分析,得到同一点3个方向的能量峰值均位于2~3 Hz,但出现的时间段各不相同,横向的能量峰值接近于纵向和垂向能量峰值的2倍。地震试验分析结果表明,随着高度增加,振动加速度幅值逐步增大,且在横向上的振动信号放大最为显著,因此抑制后备盘台横向运动是改善结构抗震性能的关键。地震试验后,后备盘台整体结构无变形和破裂,各连接件无松动和脱落,被试盘台通过了地震试验。
Abstract:
Both the numerical analysis and seismic qualification test of the response characteristics of the back-up panel(BUP)in the control room of the nuclear power plant subjected to the earthquake are carried out.The response-spectrum analysis shows that the maximum Mises stress of the BUP is 91.89 MPa,less than the maximum yield limit stress of structural material.Thus,the BUP has ideal aseismic performance.The time-history analysis shows that with the increase of the structure’s height,the maximum response of the structure gradually increases,and the vibration amplitude in the lateral direction is the most obvious.Further,time-frequency analysis of the vibration signals in the installation area of the display screen is carried out,revealing that the peak energy in three directions at the same point is mainly located in 2-3 Hz,but the time interval is deferent.The lateral peak energy is about 2 times of the longitudinal and vertical ones.The seismic test and analysis show that with the increase of the height,the amplitude of the vibration acceleration increases gradually,and the vibration signal amplification in the lateral direction is the most significant.Therefore,inhibiting the lateral movement of the BUP is the key to improving the aseismic performance of the structure.After the seismic test,the overall structure of the BUP has no visible deformation or rupture,and the connectors do not loosen or fall off,suggesting that the BUP has passed the seismic test.

参考文献/References:


黄茜,蔡逢春,黄旋,等.2020.电气机柜的地震概率易损度分析[J].核动力工程,41(1):65-69.
Huang Q,Cai FC,Huang X,et al.2020.Analysis of seismic probability fragility of cabinet[J].Nuclear Power Engineering,41(1):65-69.(in Chinese)
刘明星,杨静远,王东伟,等.2021.核电站安全级DCS机柜结构抗震分析及试验研究[J].重庆理工大学学报(自然科学),35(10):227-235.
Liu M X,Yang J Y,Wang D W,et al.2021.Seismic analysis and experiment study of safety-related DCS cabinet structure in nuclear power plant[J].Journal of Chongqing University of Technology(Nature Science),35(10):227-235.(in Chinese)
闻邦椿,刘树英,陈照波.2009.机械振动理论及应用[M].北京:高等教育出版社.
Wen B C,Liu S Y,Chen Z B.2009.Mechanical vibration theory and applications[M].Beijing:Higher Education Press.(in Chinese)
许彧青.2012.核电站主控室后备盘台人机截面建模及优化方法研究[D].哈尔滨:哈尔滨工程大学.
Xu Y Q.2012.Study on back-up panel human-machineInterface mathematical modeling and optimization method of main control room in nuclear power plants[D].Harbin:Harbin Engineering University.(in Chinese)
杨文芳,魏强,朱兰琴.2010.基于有限元分析的机载电子设备减振设计[J].振动与冲击,29(05):230-234+253.
Yang W F,Wei Q,Zhu L Q.2010.Antivibration design for an airborne electronic equipment based on finite method[J].Journal of Vibration and Shock,29(5):230-234+253.(in Chinese)
张家倍,李明高,马琳伟.2013.核电厂抗震安全评估[M].上海:上海科学技术出版社.
Zhang J B,Li M G,Ma L W.2013.Seismic safety assessment of nuclear power plants[M].Shanghai:Shanghai Science and Technology Press.(in Chinese)
赵万松,耿淑伟,董满生.2017.抗震设计反应谱特征周期研究[J].地震工程学报,39(3):502-508.
Zhao W S,Geng S W,Dong M S.2017.Research on characteristic periods of seismic design response spectrum[J].China Earthquake Engineering Journal,39(3):502-508.(in Chinese)
GB/T 13625—92,核电厂安全系统电气设备抗震鉴定[S].
GB/T 13625—92,Seismic qualification of electrical equipment for safety systems in nuclear power plants[S].(in Chinese)
HAF J0053,核设备抗震鉴定试验指南[S].
HAF J0053,Seismic qualification test guidelines for nuclear equipment[S].(in Chinese)
Cao A T,Tran T T,Nguyen T H X,et al.2020.Simplified approach for seismic risk assessment of cabinet facility in nuclear power plants based on cumulative absolute velocity[J].Nuclear Technology,206(5):743-757.
Lee H S,Kim M G,Cho C.2005.Seismic analysis on a control panel of(nuclear)power plant[J].Transactions of the Korean Society for Noise and Vibration Engineering,15(6):652-659.
Lee S M,Jung W Y.2020.Evaluation of anchorage performance of the switchboard cabinet under seismic loading condition[J].Advances in Mechanical Engineering,12(5):1687814020926309.
Salman K,Tran T T,Kim D.2020.Seismic capacity evaluation of NPP electrical cabinet facility considering grouping effects[J].Journal of Nuclear Science and Technology,57(7):800-812.
Satyavathi K V,Kumar N J,Kumar T B.2013.Finite element analysis of control panel assembly for earth quakes[J].International Journal of Emerging Technology and Advanced Engineering,2(11).
Tan K,Sun Y,Chen W.2014.Concept of advanced back-up control panel design of digital main control room[M]//Progress of nuclear safety for symbiosis and sustainability.Springer,Tokyo,27-31.
Tran T T,Cao A T,Kim D,et al.2020a.Seismic vulnerability of cabinet facility with tuned mass dampers subjected to high-and low-frequency earthquakes[J].Applied Sciences,10(14):4850.
Tran T T,Nguyen P C,So G,et al.2020b.Seismic behavior of steel cabinets considering nonlinear connections and site-response effects[J].Steel and Composite Structures,36(1):17-29.

备注/Memo

备注/Memo:
收稿日期:2023-08-16.
基金项目:国家自然科学基金项目(52105220); 四川省科技计划项目(2020YFG0474).
第一作者简介:胡利鸿(1990-),工程师,硕士,主要从事设备结构设计与仿真研究.E-mail:hulihom@163.com.
更新日期/Last Update: 2024-08-20