2006年台湾屏东7.0级地震救灾与应变分析*

(1.屏东县消防局防灾企划课,中国台湾屏东90060; 2.屏东科技大学 土木工程系,中国台湾屏东91201)

地震救灾; 灾害应对; 作业流程; 台湾

Disaster Rescue and Response Analysis of the Pingtung Earthquake with 7.0 Richter Scale in 2006
YANG Ching-Hu1,2,YEH Yi-lung2

(1.Disaster Prevention and Planning Section,Pingtung County Fire Bureau,Pingtung,Taiwan 90060,China)(2.Department of Civil Engineering,National Pingtung Universityof Science and Technology,Pingtung,Taiwan 91201,China)

Earthquake relief; disaster response; standard operating procedure; Taiwan

备注

2006年12月26日20时26分和20时34分,台湾屏东县相继发生两次芮氏规模7.0地震。地震发生后,屏东县立即成立了“12.26震灾”灾害应变中心,积极开展灾害防救工作。通过此次地震的抢救过程,检讨分析应变中心应变机制之优缺点,希望今后能为相关单位进行重大灾害抢救时提供参考,并得到更准确、适用、有效的抢救作业程序。

Two severe earthquakes occurred at 20:26 and 20:34 on December 26,2006 in Pingtung.They were with 7.0 on the Richter scale.After the earthquake,the Pingtung County started the “12.26 earthquake” disaster response center and dispatched crews and equipment to the Hengchun Fire Station,which was set as the disaster response and dispatch ststion command post.The purpose of this study was to investigate the merits and defects of the operation procedure during this Pingtung earthquake.It is expected that this examination will be the rescue reference in severe disasters for other organizations in the future.In addition,it is hoped that more precise and feasible Standard Rescue Operation Procedures can be established from the results in this study.