[1]方 颖,江在森,顾国华.汶川大地震前GPS时间序列的振荡分析*[J].地震研究,2010,33(02):125-130.
FANG Ying,JIANG Zai-sen,GU Guo-hua.Oscillation Analysis of GPS Horizontal Time Series before the Wenchuan Earthquake[J].Journal of Seismological Research,2010,33(02):125-130.
点击复制
《地震研究》[ISSN:1000-0666/CN:53-1062/P]
- 卷:
-
33
- 期数:
-
2010年02期
- 页码:
-
125-130
- 栏目:
-
- 出版日期:
-
2010-02-01
文章信息/Info
- Title:
-
Oscillation Analysis of GPS Horizontal Time Series before the Wenchuan Earthquake
- 作者:
-
方 颖; 江在森; 顾国华
-
(中国地震局地震预测研究所,北京 100036)
- Author(s):
-
FANG Ying; JIANG Zai-sen; GU Guo-hua
-
(Institute of Earthquake Science,CEA,Beijing 100036,China)
-
- 关键词:
-
GPS; 小波; 青藏高原; 汶川大地震
- Keywords:
-
GPS; wavelet; Qinghai-Tibet Plateau; Wenchuan earthquake
- 分类号:
-
P315.72+5
- DOI:
-
-
- 摘要:
-
采用复小波分析技术,分析了中国大陆GPS基准站水平向时间序列的多时间尺度和周期性变化特征。结果表明,青藏高原GPS站的南北分量在2007年初至汶川大地震发生前,出现一个周期的准同步周年振荡异常,且向北方向的半周期波峰振幅明显高于各点在印尼苏门答腊巨震后大尺度北东向长趋势运动的加速度,这可能是导致龙门山闭锁段破裂的重要触发因子。这种振荡的周期集中在汶川大地震前355~375天,与地球绕太阳公转周期非常一致。
- Abstract:
-
The article analyzed multi-time scale characteristics and seasonal changes of horizontal time series of GPS fiducial stations in Mainland China by complex wavelet analysis techniques.The results showed that,from early 2007 to the Wenchuan earthquake,a quasi-synchronous annual cycle abnormal oscillation occurred in north-south components in GPS stations of Tibet Plateau.The northward amplitudes were significantly higher than their accelerations of large-scale trends in north-east movement after the great Sumatra earthquake in Indonesia.The phenomenon was explained as follows.The great Sumatra earthquake in Indonesia might be an important trigger factor leading to the breakdown of Longmenshan locked segments.This cycle of Oscillation before the Wenchuan earthquake concentrated in between 355 days and 375 days(with the earth around the sun very consistent cycle),leading to the reasons for this change is unclear,pending further in-depth study.
备注/Memo
- 备注/Memo:
-
收稿日期:2009-09-14
基金项目:地震预测研究所基本科研业务专项“川滇地区地壳运动模型的研究”(0207690201)和国家科技攻关计划“大地形变与大地震危险区预测研究”(2008BAC44B02-0103)共同资助.
更新日期/Last Update:
2010-02-23