[1]NIE Guibo,XU Weidan,MA Jialu,et al.Three-dimensional Isolation Test of the Motor Equipment[J].Journal of Seismological Research,2024,47(01):156-162.[doi:10.20015/j.cnki.ISSN1000-0666.2024.0005]
Copy

Three-dimensional Isolation Test of the Motor Equipment

References:

程永锋,朱全军,卢智成.2008.变电站电力设施抗震措施研究现状与发展趋势[J].电网技术,32(22):84-89.
Cheng Y F,Zhu Q J,Lu Z C.Progress and development trend on seismic measures of electric power equipment in transformer substation[J].Power System Technology,32(22):84-89.(in Chinese)
郭永基.2001.电力系统及电力设备的可靠性[J].电力系统自动化,(17):53-56.
Guo Y J.2001.Reliability of power systems and power equipment[J].Automation of Electric Power Systems,(17):53-56.(in Chinese)
胡珍秀.2020.电力设施地震韧性评估方法研究[D].哈尔滨:中国地震局工程力学研究所.
Hu Z X.2020.Study on seismic resilience evaluation method of power facilities[D].Harbin:Institute of Engineering Mechanics,China Earthquake Administration.(in Chinese)
刘中华.2008.核电设备抗震试验与计算分析[D].上海:同济大学.
Liu Z H.2008.Seismic testing and analysis of equipment for NPP[D].Shanghai:Tongji University.(in Chinese)
宁晓晴.2014.考虑机械振动的风机设备两种隔震方案对比研究[D].哈尔滨:中国地震局工程力学研究所.
Ning X Q.2014.Comparative study on two kinds of isolation schemes for the fan equipment considering mechanical vibration[D].Harbin:Institute of Engineering Mechanics,China Earthquake Administration.(in Chinese)
滕艳玲.2010.核电站用三相异步电动机[J].电机技术,128(3):28-31.
Teng Y L.2010.Three-phase asynchronous motor for nuclear power station[J].Electrical Machinery Technology,128(3):28-31.(in Chinese)
王涛,王飞,侯钢领,等.2014.核电厂隔震结构的振动台试验研究[J].工程力学,31(10):62-68,84.
Wang T,Wang F,Hou G L,et al.2014.Shaking table tests on base-isolated nuclear power plant[J].Engineering Mechanics,31(10):62-68,84.(in Chinese)
魏陆顺,周福霖,任珉,等.2007.三维隔震(振)支座的工程应用与现场测试[J].地震工程与工程振动,27(3):121-125.
Wei L S,Zhou F L,Ren M,et al.2007.Application of three-dimensional seismic and vibration isolator to building and site test[J].Journal of Earthquake Engineering and Engineering Dynamics,27(3):121-125.(in Chinese)
姚堃,钱江.2017.特高压电力设备隔震技术研究[C]//陆新征.第26届全国结构工程学术会议论文集(第Ⅲ册).哈尔滨:《工程力学》杂志社,283-287.
Yao K,Qian J.2017.Research on isolation technology of uhvelectrical equipment[C]//Lu X Z,Proceedings of the 26th national conference on structural engineering(No.III).Harbin:Engineering Mechanics Periodical Office,283-287.(in Chinese)
尤红兵,张郁山,赵凤新.2012.电气设备振动台试验输入的合理确定[J].电网技术,36(5):118-124.
You H B,Zhang Y S,Zhao F X.2012.Reasonable determination of input waves for shake-table test of electrical equipments[J].Power System Technology,36(5):118-124.(in Chinese)
GB 50011—2010,建筑抗震设计规范[S].
GB 50011—2010,Code for seismic design of buildings[S].(in Chinese)
GB 50260—2013,电力设施抗震设计规范[S].
GB 50260—2013,Code for seismic design of electrical installations[S].(in Chinese)
SY 4063—1993,电气设施抗震鉴定技术标准[S].
SY 4063—1993,Standard for earthquake pesistance valuation of electric facilities[S].(in Chinese)
Similar References:

Memo

-

Last Update: 2023-12-20

Online:178       Total Traffic Statistics:4836743

Website Copyright:Editorial Office of Journal of Seismological Research
Address:148 Beichen Street, North District of Kunming City, Yunnan, China Tel: 86-0871-3355074