[1]SHI Yan,ZHANG Zhichao,LI Jun,et al.Seismic Fragility of the Long-span,Continuous,Rigid-frame Bridge with High-rise Pier Involving the State of the Internal Force[J].Journal of Seismological Research,2022,45(01):8-16.[doi:10.20015/j.cnki.ISSN1000-0666.2022.0002]
Copy

Seismic Fragility of the Long-span,Continuous,Rigid-frame Bridge with High-rise Pier Involving the State of the Internal Force

References:
郭昆霖,李小军,吴敬武,等.2020.地震行波对跨河谷高墩大跨桥梁地震反应的影响[J].地震研究,43(3):531-538.
Hwang H,刘晶波.2004.地震作用下钢筋混凝土桥梁结构易损性分析[J].土木工程学报,37(6):47-51.
李宏男,成虎,王东升.2018.桥梁结构地震易损性研究进展述评[J].工程力学,35(9):1-16.
李吉涛,杨庆山,刘阳冰.2013.多点地震激励下大跨连续钢构桥易损性分析[J].振动与冲击,32(5):75-80.
李立峰,吴文朋,胡思聪,等.2016.考虑氯离子侵蚀的高墩桥梁时变地震易损性分析[J].工程力学,33(1):163-170.
马保林.2001.高墩大跨连续刚构桥[M].北京:人民交通出版社.
庞于涛,王建国,欧阳辉,等.2018.采用钢纤维混凝土的连续钢构桥地震易损性分析[J].哈尔滨工程大学学报,39(4):687-694.
石岩,李军,秦洪果,等.2021.桥梁双柱式排架墩抗震性能研究进展述评[J].中国公路学报,34(2):134-154.
石岩,张奋杰,韩建平,等.2020.高墩大跨度连续刚构桥典型施工阶段地震损伤分析[J].振动与冲击,39(22):89-95.
童磊,王东升,王荣霞.2020.汶川地震庙子坪特大桥主桥箱梁开裂震害分析[J].世界地震工程,36(3):161-171.
赵凌志.2018.高速铁路双薄壁墩混凝土连续刚构桥施工过程地震易损性分析[D].成都:西南交通大学.
赵秋红,李晨曦,董硕.2019.深水桥墩地震响应研究现状与展望[J].交通运输工程学报,19(2):1-13.
俎林,黄勇.2020.维修加固桥梁的抗震韧性评价方法[J].地震研究,43(3):522-530.
Baker J W,Lin T,Shahi S K, et al.2011.New ground motion selection procedures and selected motions for the peer transportation research program[R].PEER Report,3.
Banon H,Veneziano D.1982.Seismic safety of reinforced concrete members and structures[J].Earthquake Engineering and Structural Dynamics,10(2):179-193.
National Institute of Building Science.1999.HAZUS99 User’s manual[R].Washington D C:Federal Emergency Maragement Agency.
Guo A X,Shen Y,Bai J L, et al.2017.Application of the endurance time method to the seismic analysis and evaluation of highway bridges considering pounding effects[J].Engineering Structures,131:220-230.
Hose Y D,Seible F.1999.Performance evaluation database for concrete bridge components and systems under simulated seismic loads[M].California:Pacific Earthquake Engineering Research Center,University of California.
Hwang H,Jernigan J B,Lin Y W.2000.Evaluation of seismic damage to Memphis bridges and highway systems[J].Journal of Bridge Engineering,5(4):322-330.
Hwang H,Liu J B,Chiu Y H.2001.Seismic fragility analysis of highway bridges[R].Mid-Ameirica Earthquake Center Technical Report,MAEC-RR-4 Project.
Lin T Y,Burns N H.1981.Design of prestressed concrete structures(3rd ed.)[M].New York:John Wiley & Sons,Inc.
Muthukumar S,DesRoches R.2006.A hertz contact model with non-linear damping for pounding simulation[J].Earthquake Engineering and Structural Dynamics,35(7):811-828.
Park Y J,Ang A H S.1985.Mechanistic seismic damage model for reinforced concrete[J].Journal of structural engineering,111(4):722-739.
Peng Y C,Zhang Z X.2020.Development of a novel type of open-web continuous reinforced concrete rigid-frame bridge[J].Journal of Bridge Engineering,25(8):05020005.
Shi Y,Li J,Qin H G,et al.2021.Correlation analysis of ground motion duration indexes and nonlinear seismic responses of a long-span continuous rigid-frame bridge with high-rise piers[J].Journal of Earthquake Engineering,25(4):1-21.
Taflanidis A A.2011.Optimal probabilistic design of seismic dampers for the protection of isolated bridges against near-fault seismic excitations[J].Engineering Structures,33(12):3496-3508.
JTG/T B02-01—2008,公路桥梁抗震设计细则[S].
Similar References:

Memo

-

Last Update: 2022-01-20

Online:136       Total Traffic Statistics:4819928

Website Copyright:Editorial Office of Journal of Seismological Research
Address:148 Beichen Street, North District of Kunming City, Yunnan, China Tel: 86-0871-3355074