[1]MA Wen-juan,HE An-hua,CAO Kai,et al.“The ninth Five-Year Plan”omen instrument and“The tenth Five-Year Plan”omen manage systematic integrating[J].Journal of Seismological Research,2010,33(04):360-364.
Copy
Journal of Seismological Research[ISSN 1000-0666/CN 53-1062/P] Volume:
33
Number of periods:
2010 04
Page number:
360-364
Column:
Public date:
2010-04-23
- Title:
-
“The ninth Five-Year Plan”omen instrument and“The tenth Five-Year Plan”omen manage systematic integrating
- Author(s):
-
MA Wen-juan1; 2; HE An-hua3; CAO Kai4; ZHAO Gang3; LI Fang-fang1
-
(1.Earthquake Administration of Ningxia Hui Autonomous Region,Yinchuan 750001,Ningxia,China)(2.School of Software Engineering,Tongji University,Shanghai 200092,China)(3.The Institute of Crustal Dynamics,CEA,Beijing 100085,China)(4.Earthquake Administratio
-
- Keywords:
-
“The ninth Five-Year Plan”instrument; protocol conversion; “The tenth Five-Year Plan”instruments
- CLC:
-
TP392
- DOI:
-
-
- Abstract:
-
Take the station about Banqiao Dong San and Zhao Ge zhuang etc of Beijing as experimental unit,after the network-rization make over beginning to accomplish“The ninth Five-Year Plan”omen instrument step by step on May 15,2009,accomplish whose seamless“The ninth Five-Year Plan”omen instrument cut-over under the premise reserving plain“The ninth Five-Year Plan”communication pattern,arriving at“The tenth Five-Year Plan”omen data management system.From operation result,It can be seen every station lasting for the half a year,whose runs the data stabilizing,outputing reliably and reforms scheme cost low,“The tenth Five-Year Plan ”management system has provided the reliable high-effect technology reference to“The ninth Five-Year Plan”omen station overall cut-over.